Medical Tent Inflating Instructions And Ground Nail Instructions
Nov 11, 2019
【Inflatable Medical Tent Inflating Instructions】
Step 1: Preparation
1. Spread the floor, and spread the air tube on the floor.
2. Align the four corner marks, paste the inflatable roof and floor with the Velcro lines.
3. Put the air conditioning hole and the window cover, zip up the door curtain, and spread the tent according to the shape.
Step 2: Inflating
1. Insert the blower into the air conditioning hole and turn on the blower.
2. When the tent is inflated to 60%, enter and spread the air tube, inflating with an air pump.
3. During inflation, the air tube needs to be manually stand up.
4. When the air tube is inflated to 70%-80%, turn off the air pump, smooth the folds in time to avoid distortion, and pull the tube to adjust it and inflatable roof to the best position.
5. Turn off the blower, pull the air tube D-ring out of the small hole on the outside of the inflatable roof.
6. After all adjustments, when the air pressure of the air tube is inflated to 2 PSI, turn off the air pump, and the tent can be used normally.
Step 3: Detail
1. Door: Pull the zippers on both sides, roll up the curtains and fix them with ropes.
2. Window: Consists of three parts, clear PVC (windproof, light transmissive), net (anti-mosquito), mesh curtain (shading).
3. Roll up the curtains from the outside and fix them to the Velcro lines on both sides.
4. Air conditioning hole: The air conditioner can be installed by rolling up the cover from the outside and fixing it on the Velcro lines.
5. The plastic hooks are placed on the air tube to hang the rope and install the wire and the light strip.
Step 4: Storage
1. After using the inflatable tent, the stains on it need to be washed off.
2. Wipe off the water above the tent and make sure it is absolutely dry before storing.
3. Storage location requirements: cool and dry.
Note: If the inflatable tent is stored without drying, it will be mildewed and rotted.
【Ground Nail Instructions】
Step 1: Nail in
1. Maintain an angle of 60° with the ground, and leave about 7 cm in length at the upper end. Use a hammer to fix the ground nail on the ground.
Step 2: Fixed
2. After a part of the ground nail is fixed on the ground, the tent rope or wire rope is hung up and fixed.
Step 3: Pull out
3. The method of pulling out the ground nail:
1) The hook of the ground nail is hung on the hook to be pulled out, or can be easily pulled out by using a hammer with a hook.
2) Insert another ground nail into the hanging hole in the upper part of the ground nail, and then shake the ground nail left and right to remove it quickly.
Step 4: Storage
4. Remove the sludge or dust on the ground nails and store them. After a period of time, the ground nails will be oxidized. Just wipe the ground nails with a small amount of lubricating oil on the towel.